Redfire75369’s avatarRedfire75369’s Twitter Archive—№ 3,389

              1. Decided to collate all the leading-edge process nodes (No Global Foundries although I have the stats, sorry) Density isn't the only factor, yes, but it's quite important. Colouring shows year that High Volume Manufacturing started. Note: SS 3GAE could be 2023 and density is TBD
                oh my god twitter doesn’t include alt text from images in their API
            1. …in reply to @Redfire75369
              Here's the graph of the various nodes. Effective Node calculated with a logarithmic trend line from TSMC's nodes. In this, you can clearly see how little Samsung's node names mean as they jump all over the place.
              oh my god twitter doesn’t include alt text from images in their API
          1. …in reply to @Redfire75369
            Notes: - Intel 7nm in the graph is the low estimate. - EN for Intel 7nm in the table is low estimate, high estimate is 3.580. - SS 3GAE could be 2023 - Density of SS 3GAE TBD
        1. …in reply to @Redfire75369
          Updates: Samsung 4LPE is 167MTr/mm^2 Samsung 3GAP is 2023, not 2024.
          oh my god twitter doesn’t include alt text from images in their API
      1. …in reply to @Redfire75369
    1. …in reply to @Redfire75369
  1. …in reply to @Redfire75369