-
Correction: "Article", I shouldn't have called it one in the first place. Note: Initially, Intel 3 was 7nm++. A short while before Intel Accelerated, it was redefined as 7nm+ while 7nm and 7nm+ "merged" to form 7nm. That's why I'm not being specific about which plus it is.
-
On another stupid thing, they think that Diamond Rapids was initially planned for Intel 3, despite Intel clearly stating 20A would be well into production. Despite claiming DMR was 2025, they assumed it'd be Intel 3, purely since they thought it was what 5nm was. (2/3)
Redfire75369’s Twitter Archive—№ 2,663