Redfire75369’s avatarRedfire75369’s Twitter Archive—№ 2,609

          1. Dr. Ann Kelleher on High-NA EUV in I18A (1/4): > We're aiming to introduce it in more in 2025, and we're setting up our processes so that if for some reason High-NA is not ready, then we will be able to continue without it. (...) anandtech.com/show/17243/anandtech-interview-with-dr-ann-kelleher
        1. …in reply to @Redfire75369
          (2/4): > (...) As soon as High-NA is ready, then we'll be able to put it into our product and use it. Good to see they're preparing for both scenarios, with a focus on High-NA, could help to avoid a 10nm debacle.
      1. …in reply to @Redfire75369
        (3/4): > The NXE:5000 is currently being built for us at ASML. When I visited ASML late last year, I saw the pieces as it was being built and put together.
    1. …in reply to @Redfire75369
      (4/4) > But we're also working with ASML, and as soon as their first High-NA tool is available for us, we will be running some of our experiments in their lab on that. so that will we will be starting as early possible.
  1. …in reply to @Redfire75369
    The 18A SRAM Wafer Display during the Intel Investor Meeting was probably the non-High-NA version of the node.